- Upon Application of Power, the Load is Energized
- When the Control Switch Opens or there is Loss of Power, the Load is De-Energized and the Delay Period Begins
- The Load will Not Start Again During the Delay Period
- Restart Occurs After the Delay Period has Elapsed
- Common Applications Include Protecting Equipment from Damage Which May be Caused by the Rapid Short Cycling of Compressor